Post Production Output
You can post output to the production journal for released production orders.
From the Home screen, select Production.
Select Output.
The Output screen shows a list of the released production orders.
Select the order for which you want to post output.
Select an item number to open the routing line.
Populate the following fields as required, selecting Next when needed:
Field Description Setup Time Enter the time required to set up the work or machine center. Run Time Enter the time required to run the operation. Scrap Quantity Enter the number of units produced incorrectly, and therefore cannot be used. Batch No. Select a production batch number.
This field is only displayed if the Production Batching app is being used.Capacity Cost Factor Enter the cost factor for the operation.
The work or machine center direct cost will be calculated by multiplying the cost factor by the direct unit cost.
The cost factor is recorded but not used in the cost calculation in the following instances:
- If the Cost Incl. Capacity Cost Factor toggle is turned off on the Variable Capacity Cost Setup page.
- If the Specific Unit Cost toggle is turned on or a value was selected in the Subcontractor No. field on the Business Central Work Center Card page.
This field is only displayed if the Show Capacity Cost Factor toggle is turned on from the Business Central Mobile Data Collection Setup page.
If a value was entered in the Capacity Cost Factor Caption field on the Business Central Variable Capacity Cost Setup page, then this field label will reflect that value.
Quantity Enter the quantity being produced. Lot No. Enter the lot number of the item being produced. Expiration Date Select the date the item expires. Package No. Enter the package number. Select Post to post the output to the production journal.
-OR-
Select Post & Print to post to the production journal and to print the report defined for the Production Jnl. Label ID field on the Mobile Data Collection Setup page.