Table of Contents

View Posted Capacity Cost Factor

Once the output has been posted for a work or machine center, you can view the capacity cost factor used.

  1. Choose the icon, enter Capacity Ledger Entries, and then choose the related link.

  2. On the Capacity Ledger Entries page, view the data in the following fields.

    Field Description
    Capacity Cost Factor Displays the capacity cost factor entered for the operation.
    Direct Cost The value is the cost factor multiplied by the direct unit cost defined for the work or machine center.

    The cost factor is recorded but not used in the cost calculation in the following instances:

    • If the Cost Incl. Capacity Cost Factor toggle is turned off on the Variable Capacity Cost Setup page.

    • If the Specific Unit Cost toggle is turned on or a value was selected in the Subcontractor No. field on the Work Center Card page.